Skip to main content
DAPSON PRIME

Port-side warehouse extension

Apapa · 2026 · Confidential client

Marine

Project photos

Project overview

Ground conditions

Driven precast concrete piles to set criteria.

Outcome

Piles supervised against set criteria; load tests met the design requirement.

Request a quote

Planning a build in Lagos? Start with the ground.

Tell us where the site is and what you plan to build. An engineer will come back with a proposed scope of investigation and a quote.